Tiled and Screened

Tiles on the floor  and new window screens have been installed on the twelve rooms on the second and third floors of the new dormitory building of the Bible School.  The tiling for each room amounts to twenty thousand Pesos (Php 20,000.00).

Dormitory Building Project Update

Training Men and Women for leadership in the Ministry

MERALCO Entrance Wire

The dorm will be ready for occupancy when the MERALCO connection which costs Php 114,000 will be installed within this week.

The entrance wire would supply the electricity for the dormitory building.  Inspectors from MERALCO are expected to inspect the connection this week.

More Beds

We still need of Sixty beds which costs Six Thousand Pesos each to fill up the twelve rooms.

Left: Newly installed screens on the windows of the dormitory rooms.  Right: Shining new tiles on the floor.  Inset: Bro. Bong Lacerna making sure the tiles are properly placed.

Bro. Joel Bangisan checking the integrity of the connection.  (inset) the connections circuit breaker.

Double deck beds from the old dormitories